Hangzhou-Shaoxing-Taizhou Railway

For the large-span tunnel in soft surrounding rock, the double-side drift excavation method is adopted for construction. The full cross-section is supported by the Φ32 cement-grouted bonded prestressed hollow anchor bolt system.
Back to list