13777381251
18069858863
Home
About Us
Company
Global business
Factory
Honor
Partner
Case
Typical Railway Cases
Typical highway cases
Typical cases of water conservancy and hydropower
Large-scale Projects in Other Countries
Typical slope case
Products
SD-type self-drilling (pre-stressed) hollow
MCP Multi-layer Anti-corrosion Anchor Bolt
Low-pretension expansion-shell rock bolt
Resin-anchored low-pretension bolt
DCP Multi-layer Corrosion-Protected
EXC-Type Pre-anchored Removable Prestressed Hollow Grouting Anchor Rod System
FAQ
Blog
Contact
Navigation
Academician Workstation
News
On-site Presentation of Hangzhou Tuqiang Yield Anchor Cable for Soft Rock Large Deformation, Muzhailing Highway Tunnel
Changsha-Ganzhou Railway
Yangtze-to-Hanjiang Water Diversion Project
Jinping Il Hydropower Station
The Jinping II Hydropower Station features great burial depth and high in-situ stress field (average depth 1610 m, maximum depth 2525 m, maximum geostress 54 MPa).
Sichuan-Tibet Railway
The Ya’an–Nyingchi section of the Sichuan-Tibet Railway features extremely complex construction conditions with a very high proportion of tunnel works, where extra-long tunnels are commonplace and rarely seen worldwide. Hazards such as rockbursts and large deformation caused by high in-situ stress, high geothermal environment and high-temperature geothermal groundwater, coupled with high altitude, severe cold and oxygen deficiency, deep mountain valleys, narrow working sites, inconvenient living conditions and poor transportation, make tunnel construction extremely challenging. These adverse factors can easily create difficulties in schedule management, quality assurance, work safety and cost control. Tunnel construction comprises working procedures including excavation surveying, drilling, blasting, mucking, shotcreting and bolt active support. It is highly important to achieve full-process mechanization and reduced manpower. Therefore, the adoption of large mechanized construction equipment holds the key to overcoming the above challenges. The application of integrated drilling, installation, anchoring and grouting bolting jumbos constitutes an important link for full-mechanized tunnel construction. An active support system is adopted for tunnel works on the Sichuan-Tibet Railway, and active bolt support serves as the core. At present, the mechanization level of prestressed bolt construction remains relatively low, and construction quality is difficult to control. Construction with integrated bolting jumbos for drilling, installation, anchoring (prestress application and locking) and grouting lays the foundation for implementing the active support system in tunnel engineering. It is of great significance for quality control and It is of great significance for accelerating construction progress. Based on years of research and practical application of domestic bolt support technology, Tuqiang Company has developed the integrated “Drilling – Mounting – Anchoring – Grouting” MT-series intelligent bolting jumbo for the harsh geological and climatic conditions of the Sichuan-Tibet Railway. Combined with our prestressed hollow anchor bolts, a complete set of mechanized bolt construction technology realizing integrated “Drilling – Mounting – Anchoring – Grouting” has been formed. From January to March 2022, the integrated intelligent bolting jumbo was used for low prestressed bolt construction at the #5 Lajie transverse adit and #1 & #2 Rulang transverse adits of the Sichuan-Tibet Railway, winning unanimous praise from the construction contractor. In April 2022, our YE25 split-set prestressed hollow anchor bolt was adopted. The bolt length is 3 m, drill hole diameter No.45. The ultimate tensile load of the bolt shank ≥188 kN, yield strength ≥133 kN, complying with the requirements for prestressed anchor bolts specified in TB/T3356-2021. A demonstration of the integrated construction process of “drilling, bolt installation, prestress application and locking, and grouting” was carried out. The whole procedure was completed within 4 minutes, with a prestress value of 70 kN, meeting design requirements. The on-site demonstration achieved full success.
Badaling Great Wall Station (Beijing-Zhangjiakou Railway)
The Beijing-Zhangjiakou High-speed Railway serves as the transportation link connecting the main venue of the Beijing Winter Olympics and the snow sports venues in Zhangjiakou. Among its projects, the underground station in Badaling Tunnel is currently the world’s high-speed railway underground station with the maximum burial depth, most complex geological conditions and most intricate structure. The station has a maximum span of 32.7 meters and an area of over 500 square meters, which cannot be supported by conventional steel arch support for ordinary tunnels. The prestressed hollow grouting anchor bolt developed by our company was adopted as the integral systematic support for this underground station, characterized as an “underground multi-layer, multi-cavity and separated group cavern vault” (composed of 78 caverns). It provided strong guarantee for the safe and smooth completion of the project.