Typical Railway Cases

Sichuan-Tibet Railway

The Ya’an–Nyingchi section of the Sichuan-Tibet Railway features extremely complex construction conditions with a very high proportion of tunnel works, where extra-long tunnels are commonplace and rarely seen worldwide. Hazards such as rockbursts and large deformation caused by high in-situ stress, high geothermal environment and high-temperature geothermal groundwater, coupled with high altitude, severe cold and oxygen deficiency, deep mountain valleys, narrow working sites, inconvenient living conditions and poor transportation, make tunnel construction extremely challenging. These adverse factors can easily create difficulties in schedule management, quality assurance, work safety and cost control. Tunnel construction comprises working procedures including excavation surveying, drilling, blasting, mucking, shotcreting and bolt active support. It is highly important to achieve full-process mechanization and reduced manpower. Therefore, the adoption of large mechanized construction equipment holds the key to overcoming the above challenges. The application of integrated drilling, installation, anchoring and grouting bolting jumbos constitutes an important link for full-mechanized tunnel construction. An active support system is adopted for tunnel works on the Sichuan-Tibet Railway, and active bolt support serves as the core. At present, the mechanization level of prestressed bolt construction remains relatively low, and construction quality is difficult to control. Construction with integrated bolting jumbos for drilling, installation, anchoring (prestress application and locking) and grouting lays the foundation for implementing the active support system in tunnel engineering. It is of great significance for quality control and  It is of great significance for accelerating construction progress. Based on years of research and practical application of domestic bolt support technology, Tuqiang Company has developed the integrated “Drilling – Mounting – Anchoring – Grouting” MT-series intelligent bolting jumbo for the harsh geological and climatic conditions of the Sichuan-Tibet Railway. Combined with our prestressed hollow anchor bolts, a complete set of mechanized bolt construction technology realizing integrated “Drilling – Mounting – Anchoring – Grouting” has been formed. From January to March 2022, the integrated intelligent bolting jumbo was used for low prestressed bolt construction at the #5 Lajie transverse adit and #1 & #2 Rulang transverse adits of the Sichuan-Tibet Railway, winning unanimous praise from the construction contractor. In April 2022, our YE25 split-set prestressed hollow anchor bolt was adopted. The bolt length is 3 m, drill hole diameter No.45. The ultimate tensile load of the bolt shank ≥188 kN, yield strength ≥133 kN, complying with the requirements for prestressed anchor bolts specified in TB/T3356-2021. A demonstration of the integrated construction process of “drilling, bolt installation, prestress application and locking, and grouting” was carried out. The whole procedure was completed within 4 minutes, with a prestress value of 70 kN, meeting design requirements. The on-site demonstration achieved full success.

< 1 >