Current geotechnical anchorage projects impose high requirements on the durability and stability of anchor cables. Conventional anchor cables commonly suffer from prestress loss and permanent performance defects. The pressure-type anchor cable with full-protection structure can prevent durability failure of the anchorage section, and improve long-term performance through compression of full-length grouting.


Category:

Low-pretension expansion-shell rock bolt

Keywords:

Full-protection Anchor Cable System


Service Hotline


Product Details

The figure shows a pressure-concentrated protective anchor cable. Its structure complies with Class I anti-corrosion standard specified in GB50086-2015. The anchor cable adopts 4/6 bare unbonded steel strands.

1. The pressure anchorage head sleeve is made of SUS316 stainless steel and prefabricated integrally in factory. (The anchorage segment is filled and sealed with cement resin material.)

Spacers shall be installed every 2 m along the free length.

2. The prestressed anchor cable is fabricated of high-strength low-relaxation φ15.2 steel strand with tensile strength ≥1860MPa. The steel strands comply with the current national standard Steel Strand for Prestressed Concrete (GB/T5224-2014).

3. YJM15-4 anchor assembly is adopted, which meets the requirements of current national standard Anchorage, Grip and Coupler for Prestressing Tendons (GB/T14370-2015).

4. Boreholes for anchor cables are constructed by rotary drilling with casing using a 215 drill bit, with an over-drilling depth of 500 mm.

5. One-time full-length grouting is applied for the anchor cable. The grout pipe is polyethylene pipe with pressure resistance greater than 4MPa.

6. Grout material is M30 neat cement slurry with Ordinary Portland Cement 42.5. Grout shall be injected from the borehole bottom until grout returns at the orifice. Supplementary grouting shall be implemented at orifice as required.

 

POINT 1

Full resistance to corrosion

The full-protection structure effectively prevents corrosion

POINT 2

Low prestress loss

Excellent long-term stability and reduced maintenance cost

POINT 3

Good deep anchoring performance

Suitable for complex geological conditions

 

Model Nominal Diameter of Steel Strand (Dn/mm) Nominal Tensile Strength (Rm/MPa) Ultimate Force of Single Steel Strand (Rm/kN) Ultimate Force of Strand Bundle (Rm/kN) 0.2% Proof Force of Single Strand (Fp0.2/kN) 0.2% Proof Force of Strand Bundle (Fp0.2/kN) Total Elongation at Maximum Force (Lo ≥ 500mm) Agt/% Fully-Protected Anchorage Section (mm×mm)
QY-4 15.2×4 1860 ≥290 ≥1160 ≥229 ≥916 ≥3.5 110×450
QY-5 15.2×5 1860 ≥290 ≥1450 ≥229 ≥1145 ≥3.5 120×500
QY-6 15.2×6 1860 ≥290 ≥1740 ≥229 ≥1374 ≥3.5 130×550
QY-7 15.2×7 1860 ≥290 ≥2030 ≥229 ≥1603 ≥3.5 140×600
QY-8 15.2×8 1860 ≥290 ≥2320 ≥229 ≥1832 ≥3.5 76~90

 

· Drilling: Surveyors accurately locate the anchor cable position, and drillers control the drilling azimuth. The borehole shall meet the designed requirements for diameter, depth, position and direction. Understand the lithology and thickness of the anchorage zone. Casing following shall be adopted to prevent borehole collapse and drill jamming. Clean the borehole after drilling.

Purpose: Ensure borehole quality, create favorable conditions for anchor cable installation, and guarantee the anchor cable exerts anchoring effect in accordance with design requirements.

· Anchor Cable Inspection and Repair: If the protective sleeve is damaged or grease overflows during transportation of factory prefabricated anchor cables, the damaged area shall be wrapped with heat-shrinkable tube and fastened with binding tape to prevent corrosion of the anchor cable body.

Purpose: Guarantee the anti-corrosion performance of anchor cables and maintain stable mechanical properties.

· Anchor Cable Installation: After the borehole reaches the designed depth, clean the hole then install the anchor cable and carry out grouting. Before installation, inspect the borehole (handle hole collapse and other defects) and the anchor cable body (repair damaged protective layer, etc.). Push the anchor cable uniformly without rotation to ensure full penetration and unobstructed grout pipe.

Purpose: Ensure proper positioning of anchor cables, lay a solid foundation for subsequent grouting, and achieve effective bonding between anchor cables and rock mass.

· Grouting: Follow grouting procedure and fix the grouting plug effectively (external grouting plug made of rubber stopper or non-woven fabric). Pre-fill the external grouting plug under 0.2–0.4MPa pressure before grouting. Perform pressure grouting after strength reaches 20MPa. The grout pipe is fed into borehole bottom together with anchor cable, pulled out slowly while keeping the pipe immersed in grout until full grouting. Drain accumulated water if present.

Purpose: Form a firm bonding body between anchor cable and rock mass, transfer anchoring force and ensure anchoring performance.

· Tensioning: Tensioning shall be carried out when the cement slurry inside borehole reaches 70% of the designed strength. Record elongation and stress condition. Stop tensioning and identify causes in case of abnormality before resuming. Avoid collision with jack during tensioning; personnel shall not stay behind the jack. During anchor cable anchoring test, jack reaction force shall not act on the crown beam and waist beam.

Purpose: Introduce prestress into anchor cable and apply anchoring force to rock mass for reinforcement, while ensuring construction safety. Any matters not covered herein shall comply with JGJT401-2017 Technical Specification for Testing and Monitoring of Rock Bolts and other relevant codes.

Self-drilling hollow anchor rod system with

The construction technology for self-drilling, pre-stressable hollow anchor rods is suitable for various complex geological conditions

View Details

SD-type self-drilling (pre-stressed) hollow

Primarily used for permanent system support and advanced pre-support in weak surrounding rock, such as fractured rock strata and loose soil layers.

View Details

EXC-Type Pre-anchored Removable Prestressed Hollow Grouting Anchor Rod System

The EXC-Type Shell-expanding Removable Hollow Grouting Anchor Rod is a new type of anchor rod developed by Hangzhou Tuqiang Engineering Materials Co., Ltd. for engineering scenarios requiring pre-anchoring prior to excavation.

View Details

DCP Multi-layer Corrosion-Protected

China’s first domestically pioneered multi-corrosion-protection anchor bolt system. This support system features multiple anti-corrosion barriers. It boasts simple structure, convenient construction, excellent durability and low cost, ranking among the anchor bolts with superior supporting performance in China at present.

View Details

Consult Now

Please provide your contact information, and we will contact you as soon as possible.

Submit Message
Consult Now