To meet the requirements of timeliness, initiativeness and durability of supporting structures for tunnels with large deformation in soft rock, considering the poor adaptability of mechanical anchoring in soft rock tunnels and the long waiting time of cement-based anchoring, and combining existing research results that resin anchoring can rapidly apply prestress and cement grout anchoring delivers favorable long-term supporting strength, a rapid prestressed birdcage anchor cable system featuring "resin birdcage enlarged end anchorage + full-length cement grout anchoring" is proposed and developed.


Category:

Low-pretension expansion-shell rock bolt

Keywords:

Prestressed Fully-Bonded Protected Birdcage Anchor Cable


Service Hotline


Product Details

To meet the requirements of timeliness, initiativeness and durability of supporting structures for tunnels with large deformation in soft rock, considering the poor adaptability of mechanical anchoring in soft rock tunnels and the long waiting time of cement-based anchoring, and combining existing research results that resin anchoring can rapidly apply prestress and cement grout anchoring delivers favorable long-term supporting strength, a rapid prestressed birdcage anchor cable system featuring "resin birdcage enlarged end anchorage + full-length cement grout anchoring" is proposed and developed.

 

Product Structure

The cable system consists of birdcage structure (36 mm), steel strand (21.8 mm), anchor cable, backing plate, grouting bladder, grouting protective sleeve (36 mm) and single-hole anchorage.

1. Birdcage Structure: Inner supports are installed between steel strands to enlarge the diameter of steel strands. The total length of the birdcage structure is 1.2 m, and the spacing between adjacent birdcage anchor cables is 30 cm.

2. Anchor Cable: 1×19 anchor cable is adopted, with steel strand diameter of 21.8 mm.

3. Backing Plate, Hemispherical Washer and Nut: External locking fasteners for prestress and load-transferring components. The backing plate is provided with grouting (or vent) holes.

4. Grouting Ball Pad: The grouting ball pad is reserved with grouting inlet and grouting vent. The structural schematic of the grouting ball pad is shown in Figure 5.

5. Grouting (Vent) Pipe: One end of the plastic pipe extends into the borehole and the other end remains outside the tunnel. It is used together with hollow anchor cables according to anchor cable installation mode (upward or downward installation) to serve as grouting or vent passage.

 

Construction Notes

Drilling: Use of an unsuitable drill bit or non-standard operation will result in inaccurate borehole diameter and crooked boreholes, which affects anchor cable installation and anchoring force.

Perpendicularity between Borehole and Rock Bearing Surface: Boreholes shall be perpendicular to the bearing surface of the initial shotcrete face as far as possible to facilitate force bearing of the bearing plate.

Grouting: Proper and reliable grouting equipment and the water-cement ratio of cement slurry are key factors for full grouting of anchor cables. The screw pump shall run continuously during grouting to prevent slurry solidification inside the pipeline.

Self-drilling hollow anchor rod system with

The construction technology for self-drilling, pre-stressable hollow anchor rods is suitable for various complex geological conditions

View Details

SD-type self-drilling (pre-stressed) hollow

Primarily used for permanent system support and advanced pre-support in weak surrounding rock, such as fractured rock strata and loose soil layers.

View Details

EXC-Type Pre-anchored Removable Prestressed Hollow Grouting Anchor Rod System

The EXC-Type Shell-expanding Removable Hollow Grouting Anchor Rod is a new type of anchor rod developed by Hangzhou Tuqiang Engineering Materials Co., Ltd. for engineering scenarios requiring pre-anchoring prior to excavation.

View Details

DCP Multi-layer Corrosion-Protected

China’s first domestically pioneered multi-corrosion-protection anchor bolt system. This support system features multiple anti-corrosion barriers. It boasts simple structure, convenient construction, excellent durability and low cost, ranking among the anchor bolts with superior supporting performance in China at present.

View Details

Consult Now

Please provide your contact information, and we will contact you as soon as possible.

Submit Message
Consult Now